s / n | Work | Construction time |
1 | Installation of calorimeters ultrasound and remote reading of measurements in BMS system - K1 Vodafone building | 2014 |
2 | Airconditioning Todaylicius Vas. Georgiou 31 | 2013 |
3 | air conditioning in the Wind store Trikala | 2013 |
4 | air conditioning in the store Wind Ilioupoli - Athens | 2013 |
5 | Installation of calorimeters ultrasound and remote reading of measurements in BMS system - K2 Vodafone building | 2013 |
6 | Provision AHU or heat pump - Wellness clinic rehabilitation. | 2013 |
7 | closed control Climatic Data center construction in the Forthnet - Thermi - Thessaloniki | 2012-2013 |
8 | Airconditioning housing complex B2 Ithacas | 2012-2013 |
9 | Heat pump 16kW residential M2 - Pournari - Thessaloniki | 2012-2013 |
10 | Input Air - clinic rehabilitation wellness | 2012-2013 |
11 | Supply - reconstruction conditioning installation Porto Center | 2012 |
12 | Airconditioning ophthalmology clinic - Laser Eye | 2012 |
13 | VRV air conditioning in the apartment - Tsimiski 77 | 2012 |
14 | Installing air-Fire-hydraulic Balkh SA - Kavala | 2011 |
15 | District heating Serres - installation 1100 thermal district heating substations in buildings in Serres. | 2008-2010 |
16 | Lamia Polyclinic - Manufacture of air conditioning systems, fire, plumbing. | 2007-2008 |
17 | Installing air-Fire-hydraulic thermoplastic BE - Baloglou - Kavala | 2010 |
18 | Polyclinic Tripoli, design and construction rules for the application / M installations (air-Fire-hydraulic-electric) | 2008-2009 |
19 | Wellness Polyclinic - Design rules for the application of all EM installations and construction / M installations (air-Fire-hydraulic) | 2007-2009 |
20 | Alapis - Gerolymos - Mechanical installations of the building and its surroundings | 2008 |
21 | Leto Piraeus - Design and construction of electromechanical department store facilities. | 2005 |
22 | Leto Ag. Paraskevi - Design and construction of electromechanical department store facilities. | 2006 |
23 | Central exhibition Nissan - Theocharakis - Thessaloniki - Design and construction rules for the application / M installations (air-Fire-hydraulic-electric) | 2003 |
24 | Headquarters main building Cosmote Evosmos - Air conditioning VRV & closed control / fire / hydraulic | 2012 |
25 | VRV air conditioning / fire / hydraulic | 2004 |
26 | Express Service, private MOT - Mechanical installations of the building and its surroundings | 2008 |
27 | Express Interfracht - Balcon rail logistics - Installation of air-fire-water-drainage central warehouse logistics Thessaloniki | 2010 |
28 | Shop Sato IKEA - Installation of water-sanitation-fire-fire alarm | 2009 |
29 | Shop Sato Oreokastro - Anakataskef water-sewer-fire-fire alarm installation | 2009 |
30 | Supply fire protection system installation | 2008 |
31 | Baby stores Leto Peristeri - Construction Mechanical Installations | 2007 |
32 | Restaurant Butcher Shop - Athens - Installation of air conditioning-ventilation-water-drainage | 2005 |
33 | Airconditioning Data Center in Platanias - Crete - Air conditioning closed control / fire. | 2009 |
34 | Factory packing fish Hadjisotiriou - air conditioning VRV | 2008 |
35 | Central delegation Emico - Internal electrical building installations | 2003 |
36 | Shop Sephora Trikala - Reconstruction conditioning installation | 2008 |
37 | Hellenic Steel - Design of construction and michaimatos Coil Packing | 2002 |
38 | Airconditioning Starbucks store Tsimiski | 2008 |
39 | Airconditioning store Starbucks Alexander | 2008 |
40 | Design, construction Mr. fuel pipeline installation sleeve | 2007 |
41 | Yokohama central warehouse - air conditioning-ventilation Installation | 2008 |
42 | Headquarters Vodafone chaladriou - Reconstruction of heating / air conditioning installation | 2011 |
43 | Fire parking 3.000m2 Nikopolis Thessaloniki / win | 2007 |
44 | Express service pediatric - Installation of air conditioning, ventilation and heating | 2001 |
45 | Nissan Theocharakis - central delegation - Installation of air conditioning-heating-ventilation | 2006 |